I have a quick query if you don’t mind providing some response?

 

We have a project that has an existing phase and a proposed works phase. The work on the proposed was completed this summer and was a full remodelling of the building with new extension and demolitions of walls, doors and windows etc.

 

We now have another project at the same building for an additional extension.

 

I can merge the existing phase in to the proposed works phase OK to create an updated existing plan. However the problem I have is how do I get rid of the previous demolitions? I have tried to manually delete each element which for some elements work OK but others repair opening in walls which is not correct.

 

Is there a way that the demolitions can be omitted?

 

Many thanks

Gary Cleary TIFireE
GROUP CAD Manager
EC Harris LLP
Three Piccadilly Place
Manchester
M1 3BN
Mobile:+44 (0) 7776 177545
Direct Dial:+44 (0) 161 245 8715
Switchboard:+44 (0) 161 245 8700
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.047 seconds.